There are two types of contracts in the BuildTopia application: Turnkey and Unit-of-Measure. Turnkey contracts are lump sum where the costs are based on a scope of work for a specific plan in a project. Unit of Measure contracts are the unit costs of the activities based on the scope of work of the activity. The actual cost per plan is calculated by multiplying the unit cost times the quantities included on plans and options.